• Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
  • Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
  • Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
  • Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
  • Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
  • Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop

Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop

Color: Grey
IP Rating: IP67
Surface Treatment: Polishing
Application: Electrical Wire Cable Protection
Material: PVC
Certification: UL,CSA
Samples:
US$ 0.2/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CT-ULCP
Features
Sunglight Resistant,Impact Resistant etc.
Samples
Available
Standard
UL 651
Fire Rating
UL 94 V0 Fire Rated
Transport Package
Plastic Bag
Specification
1/2, 3/4, 1, 1-1/4, 1-1/2, 2, 3, 4, 5, 6, 8inch
Trademark
Ctube
Origin
Dongguan, China
Production Capacity
10000000 Meters/Week

Product Description

Ctube Schedule 40 PVC Rigid Conduit Couplings With Center Stop

[Product Description&Views]

Rigid Expansion Couplings are used to connect two pieces of conduit together

1,  Comply with UL651.
2,  PVC schedule 40 construction. 
3Center stop coupling used to join lengths of conduit pipe together with two solvent weld socket ends.
4, Designed for above-ground and below-ground applications.
5, Durable and eco-friendy PVC, will not rust or corrode which is especially important in outdoor applications.
6, Sunlight resistant, ideal for both indoor and outdoor applications.

Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
Ctube Schedule 40 PVC Rigid Conduit Couplings with Center Stop

[Product Parameters]

Size(in)

Part No.

W(in)

L(in)

ID(in)

1/2

CT-ULCP01

1.065

1.500

0.852

3/4

CT-ULCP02

1.307

1.563

1.064

1

CT-ULCP03

1.602

2.000

1.329

1-1/4

CT-ULCP04

2.019

2.165

1.677

1-1/2

CT-ULCP05

2.252

2.357

1.918

2

CT-ULCP06

2.744

2.600

2.393

2-1/2

CT-ULCP07

3.350

3.500

2.890

3

CT-ULCP08

4.035

3.875

3.515

3-1/2

CT-ULCP09

4.539

4.000

4.015

4

CT-ULCP10

5.039

4.188

4.515

5

CT-ULCP11

6.168

5.375

5.593

6

CT-ULCP12

7.430

6.375

6.658

8

CT-ULCP13

9.315

8.346

8.669

 

 

Ctube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center StopCtube Schedule 40 PVC Rigid Conduit Couplings with Center Stop
[FAQ]

1.What is your MOQ ?

   Depend on your order (different kinds of items have different MOQ )

2. What is your delivery time ?

    Normally, the time of delivery duration is around 15 days

3. What is the shipping port ?

    We ship the goods via shenzhen port

4. What is your payment term ?

    We accept 30%T/T in advance, 70% in the period of shipment or 100%L/C

5. How should I contact you ?

    You can contact us with Trade Manager or send us an email

6. How about the samples ?

    Our samples are free . we could send you the sample, most samples are free to send to most place.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now