Product Description
Product Details
Overview
Brand: |
Ctube |
OEM: |
Available(Thicknesses and colors of products can be customized.) |
Material: |
UPVC |
Length: |
Customized |
Thickness: |
Customized |
OD Range: |
20-150mm |
Certification: |
AS/NZS 2053, IEC61386, ISO, ASTM |
Color: |
Grey |
Fire Resistance: |
UL94 V0 |
UV Resistance: |
Yes |
Conductivity: |
Insulated |
Hardness: |
Rigid & impact-resistant |
Packing: |
By bundled or wooden pallet |
Sample: |
Free |
Country: |
China |
Factory: |
Dongguan, Guangdong |
Features
- Best for power utilities and projects.
- Medium-duty resistant to max 750 Nt/5cm compression.
- Meets AS/NZS 2053, IEC61386-1, IEC61386-21 , ISO4589-2, ISO9001, ISO14001, UL94.
- Resistant to impact, sunlight, and fire.
- Glossy and smooth surface and interior.
- Durable non-conductive PVC will not rust or corrode
- Suitable for both above and below ground applications.
Application
Ctube 20-150mm medium duty rigid electrical conduits are sunlight resistant and used exposed, encased in concrete, concealed in walls, and in direct burial applications including systems for:
- Utilities;
- Cable, data, and communication lines;
- Institutional, commercial, and industrial buildings;
They are specially designed and produced for wiring applications and protect the electrical connections from the weather, as well as protect people from accidental electric shocks.
Size Chart
Product Code |
Nominal Size |
Min W.T. |
Max W.T. |
Length |
CT-MDRCY16 |
16mm |
1.6mm |
1.9mm |
4m |
CT-MDRCY20 |
20mm |
1.8mm |
2.1mm |
4m |
CT-MDRCY25 |
25mm |
1.8mm |
2.1mm |
4m |
CT-MDRCY32 |
32mm |
2.1mm |
2.4mm |
4m |
CT-MDRCY40 |
40mm |
2.4mm |
2.7mm |
4m |
CT-MDRCY50 |
50mm |
2.8mm |
3.1mm |
4m |
CT-MDRCY63 |
63mm |
3.0mm |
3.5mm |
4m |
CT-MDRCY80 |
80mm |
3.5mm |
4.1mm |
4m |
CT-MDRCY100 |
100mm |
4.5mm |
5.2mm |
4m |
CT-MDRCY150 |
150mm |
6.3mm |
7.1mm |
4m |
Company Profile
Manufacturing Capability
- Production capacity: 100000 meters per week
- Packaging methods: by simple bundled or wooden pallet
Our Advantages
Certifications
Quality Certification:
- Conforms to AS/NZS 2053, IEC61386, ISO, ASTM, UL94.
Exhibition
Projects
Packaging & Shipping
FAQ
1. What is your MOQ?
- The MOQ of this product is usually 3000 meters.
2. What is your delivery time?
- It depends on the location. Normally the delivery time is around 15-30 days in North America.
3. What is the shipping port?
- We usually ship the cargo via Shenzhen Port.
4. What is your payment term?
- We accept T/T, or L/C, can be negotiated.
5. How should I contact you?
- You can contact us by submitting an inquiry form here. → contact us
6. How about the samples?
- Normally we can provide free samples unless you require too many.